BSECC installed numerous irrigation water meters on the Sunraysia Modernisation Project from 2014 to early 2016. Irrigation meters ranged from 80mm in diameter to 300mm. Many dethridge wheel sites also had to be removed.
This project required the following skills to be utilised in order to complete the work succesfully:
- Landholder consultation
- Obtaining excavation permits
- Cable location using cable locator
- Physical cable location utilising hydro excavation
- Overhead electrical spotting
- Asbestos removal
- Concrete coring
- New meter installation
BSECC has a strong appreciation for the importance of data quality in a project of this nature. High level safety and quality policies were adhered to on this project.