BSECC
CIVIL + ELECTRICAL
BSECC excavator working alongside a data centre building under construction
CIVIL + ELECTRICAL CONTRACTOR — EST. 1986

In-ground electrical.
Since 1986.

Trenching, conduit, pits, HV/LV and ITS packages for Tier 1 builders and major infrastructure projects across Victoria and South Australia.

40+YEARS
50+FIELD CREW
30+PIECES OF PLANT
SCROLL
01 — WHO WE ARE · BSECC PTY LTD
40 years in the ground.

BSECC Pty Ltd (formerly Brett Sheldon Electrical) was founded in 1986 and specialises in in-ground electrical works. We have delivered complex civil electrical and ITS packages for major Tier 1 projects across Victoria and South Australia.

VicRoadsVICROADS PREQUAL STCE1Energy Safe VictoriaREC 20164AusNet, CitiPower, Jemena, Powercor and United EnergyVESI / VEDN ACCREDITED
02 — CAPABILITIES SELF-PERFORMED

What we do.

Multi-way HV, LV and comms duct banks stood up across a data centre site
ON THE TOOLS — VIC
01

Conduit installation

HV, LV and comms duct banks, stabilised sand backfill.

30+PIECES OF PLANT
EXCAVATORS 1.7 – 30T
50+ELECTRICIANS, OPERATORS,
CONCRETERS & SUPERVISORS
40+YEARS EXPERIENCE
IN-GROUND ELECTRICAL
03 — DIRECTLY EMPLOYED
Union crews. Every metre.

We operate under our ETU and CFMEU Enterprise Agreements. Directly employed crews, on our own plant. More than 50 electricians, plant operators, concreters, dogmen, general labourers, supervisors and engineers, working on our own modern fleet.

Electrical Trades Union VictoriaCFMEU Construction
50+ DIRECTLY EMPLOYED30+ PIECES OF PLANT
Orange conduit banks stood up across a data centre site, with an excavator and concrete truck working behind
CONDUIT INSTALLATION — HV / LV / COMMS
04 — Current projects 2025 / 2026

Where we are working currently.

In-ground electrical works for data centres, major infrastructure and freeway ITS and lighting projects: complex trenching, conduit installation, pit installation, rock excavation and associated civil electrical works.

Data centres & large infrastructureLIVE ON SITE

AWS MEL-081

Truganina VIC

LENDLEASE | STOWE
2025 — CURRENT

LendleaseStowe Australia

MEL02

Tullamarine VIC

SKS | BUILT
JUNE 2026 — CURRENT

SKSBuilt

RAAF Base Data Centre

Edinburgh SA

LENDLEASE | FREDON
2025 — CURRENT

LendleaseFredon
Freeway ITS & lightingLIVE ON SITE

North East Link M80 Ring Road

Melbourne VIC

ACCIONA
2025 — CURRENT

Acciona

North East Link Hoddle to Burke

Melbourne VIC

SEYMOUR WHYTE & JOHN HOLLAND JV
2025 — CURRENT

Seymour WhyteJohn Holland

North East Link Tram to Springvale

Melbourne VIC

CPB & BMD
STARTING 2026

CPB ContractorsBMD

Self-performed, start to finish.

ITSTRENCHHV/LVPITSPOLESCONCRETE
A 240T slew crane lowering a precast pit into position at AWS MEL-081
PIT SET — 120T / 240T SLEW CRANE
05 — Case study Data centre

AWS MEL-081.

Truganina VIC · 2025 — Current

BSECC is delivering in-ground electrical works across two Lendlease data centre projects. At AWS MEL-081 we delivered the civil electrical scope for Stowe Electrical: deep trenching, rock excavation, backfill and heavy pit installation.

Scope delivered2025 — CURRENT
7,000mTotal trenching
2,000mDeep trenching at 3.5 – 5m
3,000tRock removed
10,000Stabilised sand backfill
40+Pits 10 – 25T, set with 120T & 240T slew cranes
50+Pits 0.5 – 5T

Every metre, our own crews.

Delivered for
LendleaseStowe Australia
BSECC excavators, tippers and crew working a night shift on the North East Link, orange barriers dividing the work zone from live freeway lanes
CONDUIT RUN — NORTH EAST LINK
06 — Case study Freeway ITS & lighting

North East Link.

Melbourne VIC · Three packages, three builders · 2025 — Current

Each package was won on the back of the last, with a different head contractor each time.

Package by packageVICROADS STCE1
01

M80 Ring Road

ACCIONA
2025 — CURRENT

Acciona
02

Hoddle to Burke

SEYMOUR WHYTE & JOHN HOLLAND JV
2025 — CURRENT

Seymour WhyteJohn Holland
03

Tram to Springvale Alliance

CPB & BMD
STARTING 2026

CPB ContractorsBMD
20,000mAPPROX. LINEAL METRES OF CONDUIT INSTALLED
500APPROX. VICROADS PITS INSTALLED

One package earns the next.

Scope across the three packages: conduit installation and backfill, VicRoads pit installation, VicRoads cabinet foundations and light pole foundations.

Part of
Victoria's Big BuildNorth East Link
07 — WHO WE WORK FOR · TIER 1 CLIENTS

A few of our past projects.

BSECC works as a specialist subcontractor to Australia’s major head contractors and electrical contractors. Repeat work, package after package.

West Gate Tunnel Project works: sawtooth acoustic walls, excavators, a site dumper and crew alongside live traffic lanes
WEST GATE TUNNEL PROJECT
West Gate Tunnel ProjectMelbourne VIC · CPB & John Holland JVFEB 2019 – SEP 2025
Port Rail Transformation ProjectMelbourne VIC · Seymour WhyteMAR 2022 – MAY 2023
Monash Freeway Upgrade Stage 2Melbourne VIC · CPBAUG 2021 – AUG 2022
Tullamarine Widening ProjectMelbourne VIC · LendleaseNOV 2016 – OCT 2018
LendleaseCPB ContractorsJohn HollandSeymour WhyteAccionaBMDFredonStowe AustraliaSKSBuilt
DATA CENTRES · FREEWAY ITS · LIGHTING · RAIL
08 — CONTACT · MANAGEMENT

Talk to us about your in-ground package.

Brett Sheldon
Director
Tom Sheldon
General Manager
Jack Sheldon
General Manager
Emailinfo@bsecc.com.au Phone0419 961 988
HEAD OFFICE — 2/7 EVERAISE CT, LAVERTON NORTH VIC
REGISTERED OFFICE — 88 WHARPARILLA DRIVE, ECHUCA VIC 3564
BSECC PTY LTD — FORMERLY BRETT SHELDON ELECTRICAL — EST. 1986
ABN 56 605 204 402 — REC 20164